How to Challenge Dilapidations Claims in Commercial Leases

Editorial Status & Legal Guidance

This guide is maintained as a current resource for September 2026 and covers only the laws of England and Wales. Information is for general guidance, not legal advice. Consult a qualified solicitor for advice specific to your situation.

Key Takeaways for How to Challenge Dilapidations Claims in Commercial Leases

Learn how tenants can challenge dilapidations claims in commercial leases in England and Wales, including reviewing lease terms, engaging professional surveyors, responding to schedules and negotiating disputes, with practical legal guidance and statutory considerations.

Property Standards: Housing disputes are managed through the Landlord and Tenant Acts. Protect your rights by ensuring all claims are grounded in current statutory legislation.

At the end of a commercial lease, landlords commonly serve dilapidations claims requiring tenants to carry out repairs, reinstate alterations or settle costs for property works that, in the landlord's view, the tenant is obliged to complete under the lease. These claims can be substantial and contentious, especially where the tenant believes the items are unnecessary, excessive or outside their contractual responsibilities. Knowing how to challenge a dilapidations claim is vital for reducing exposure to excessive liabilities and protecting business interests. This article explains the legal framework, procedural rights, practical steps, common defences, and risks involved in disputing dilapidations claims in England and Wales.

What Are Dilapidations Claims?

Dilapidations are alleged breaches of a tenant's repairing, reinstatement, decorating and statutory compliance covenants under a commercial lease. These most often come to light at or near the end of the lease term when a landlord inspects the property and prepares a Schedule of Dilapidations detailing alleged breaches and the costs of remedial works. A Quantified Demand typically accompanies the schedule, stating the estimated cost of carrying out works and, in some cases, losses such as rent during works.

Lease Obligations and the Schedule of Condition

Whether a tenant is required to rectify certain items depends primarily on the specific wording of the lease. Key covenants include repairing, compliance with statutory obligations (such as building regulations and safety standards) and obligations to reinstate alterations at the end of the lease. In some leases, a Schedule of Condition agreed at the start of the lease can limit tenant liability by recording the property's original state for comparison purposes.

Related:  Understanding Limitation Periods for Property Claims

Statutory Restrictions on Damages

Under Section 18(1) of the Landlord and Tenant Act 1927, damages for breach of repairing covenants are limited to the reduction in the value of the landlord's reversion caused by the breach. This means a landlord cannot recover the full cost of repairs if the works do not materially increase the property's value, and claims for speculative or unnecessary works can be challenged on this basis.

Pre‑Action Protocol and Timeframes

Commercial dilapidations claims are governed by the Dilapidations Protocol, a recognised pre‑action process for property claims. Under this protocol:

  • The landlord must serve the Schedule of Dilapidations and a Quantified Demand within 56 days of lease termination (or other agreed period).
  • The tenant then has 56 days to respond formally, identifying items they accept, dispute or consider already remedied.
  • Parties are expected to engage in pre‑action negotiation and consider Alternative Dispute Resolution (ADR) before litigation.

Practical Steps to Challenge a Dilapidations Claim

1. Review the Schedule and Lease Terms

Start by analysing the landlord's schedule alongside your lease:

  • Check whether each item falls within the tenant's contractual obligations.
  • Identify items that are arguable fair wear and tear or outside the scope of the lease.
  • Note whether costs are justified and proportionate given the covenant.
    Careful review often reveals areas where the landlord's claim can be reduced or rejected altogether.

Given the technical and legal nature of dilapidations, tenants should consider:

  • Engaging an independent dilapidations surveyor to inspect the property and prepare a Schedule of Reply that questions or re‑costs items included in the landlord's schedule.
  • Consulting a commercial property solicitor to assess legal points, such as the limits under Section 18 and the strength of arguments about what constitutes a breach.
    Surveyors not only help challenge unnecessary items but can also negotiate with the landlord's surveyor to reduce overall liability.
Related:  What Is a Tenancy Agreement and Why It Matters

3. Respond to the Quantified Demand

Within the designated period (typically 56 days), tenants should serve a formal response to the Quantified Demand:

  • Accept the items genuinely requiring attention;
  • Dispute items that are outside lease obligations, unnecessary or overpriced;
  • Set out evidence, including photographs, lease wording and surveyor reports.
    Clear, evidence‑based responses help frame negotiations and reduce the likelihood of costly litigation.

4. Negotiate and Explore ADR

Landlords and tenants are encouraged to negotiate settlements before court action. ADR methods such as mediation, early neutral evaluation and structured negotiation can lead to:

  • Reduced settlement amounts;
  • Agreement on scope of works; or
  • Staged implementation.
    Engaging in ADR early demonstrates reasonableness, helps control costs and avoids escalation to litigation.

Common Defences and Dispute Points

Fair Wear and Tear

Natural wear and tear that arises from normal use of the property is generally not recoverable. If the landlord's schedule includes items that are a result of ordinary use rather than neglect or breach, these can often be challenged.

Betterment and Cost vs Value

Under the Section 18 cap, if proposed repairs would not increase the property's value by at least the repair cost (for example where the building is to be redeveloped), the claim value may need to be reduced accordingly.

Scope of Repair and Reinstatement

Disputes arise where landlords include works that go beyond what is strictly required by the lease. For example:

  • Decorating that exceeds contractual standards;
  • Reinstatement items not validly triggered by required notices; and
  • Costs that reflect improvement rather than restoration.
    Challenging such items often requires expert interpretation of lease covenants and measurement against industry practice.

Litigation and Court Proceedings

If negotiations fail to resolve the dispute, either party may issue a claim in the county court seeking determination of outstanding issues. In court:

  • The landlord must justify that the tenant breached specific covenants;
  • The tenant can argue that items are outside lease obligations, not justified, or limited by statutory valuation principles;
  • Both parties may rely on expert surveyors and legal submissions.
    Litigation should be a last resort due to cost and time, but sometimes it is necessary where fundamental disagreements remain.
Related:  How to Contest Unlawful Eviction Claims

Risks and Practical Considerations

Costs and Professional Fees

Dilapidations disputes can be costly, with professional fees for surveyors and solicitors often exceeding the repair sums. Early engagement can reduce risk by identifying weak points in the landlord's claim and guiding negotiation strategy.

Lease Drafting and Future Risk Management

Many disputes arise from unclear lease drafting. Tenants should aim to negotiate favourable repair obligations at the start of the lease, including:

  • Incorporating or agreeing a Schedule of Condition;
  • Limiting repairing obligations to “reasonable repair” rather than more onerous standards;
  • Clarifying reinstate clauses.
    Well‑drafted leases reduce ambiguity and future dispute risk.

Key Takeaways

Challenging dilapidations claims at the end of a commercial lease in England and Wales involves:

  • Careful review of lease obligations and the landlord's Schedule of Dilapidations;
  • Engaging independent surveyors and legal advisers to assess and prepare a robust response;
  • Responding to the landlord's Quantified Demand within prescribed timeframes;
  • Negotiating settlements and, where appropriate, using ADR;
  • Understanding statutory limits, such as the Section 18 cap on damages.

Early planning, evidence‑based responses and professional support increase the likelihood of reducing a claim or securing a fair resolution while controlling costs and legal exposure.